
Founder & CEO at SolveMpire. Directing multidisciplinary product engineering, mechanical architecture, embedded hardware systems, and scalable connected platforms.
Product engineering studio overview
SolveMpire is an integrated, full-stack product engineering studio based in Andhra Pradesh, India. We partner with ambitious founders, venture-backed startups, and industrial enterprises worldwide to engineer turnkey physical machines, custom electronics, real-time embedded firmware, and connected IoT cloud platforms under one roof.
To eliminate the devastating friction of fragmented engineering by uniting 3D parametric mechanical CAD, custom multi-layer PCB design, deterministic real-time firmware, and scalable factory manufacturing under single-contract ownership—turning high-risk concepts into certified, production-ready commercial products.
To establish India's foremost deep-tech physical product engineering powerhouse—setting the global standard for rapid electromechanical innovation, rugged industrial automation, and turnkey fleet reliability across international markets.
Parametric 3D CAD modeling in Fusion 360, CNC sheet metal bend tolerances, injection mold tooling, IP65/IP67 gasketing, thermal CFD airflow loops, and vibration damping.
Industrial multilayer KiCad schematics, high-speed differential routing, STM32/ESP32 silicon, power MOSFET switching, CAN/RS-485 bus, and automated Bed-of-Nails test fixtures.
Deterministic FreeRTOS multitasking, hierarchical state machines, DWIN DGUS industrial touchscreen interfaces over UART, dynamic UPI payments, and fail-safe safety watchdogs.
MQTT over TLS 1.3 telemetry, cellular 4G Cat-1 fallback, real-time cloud dashboards, dual-partition A/B OTA remote updates, and multi-year engineering SLAs (up to 10 years).
We eliminate friction between disconnected CAD, electronics, and firmware vendors by housing all engineering disciplines under one synchronized team with single-point accountability.
Every 3D model and PCB layout is engineered with real manufacturing constraints in mind — tooling tolerances, bend deductions, component availability, and rapid factory assembly.
We stay actively engaged through mass production tooling, initial field deployments, OTA firmware updates, and multi-year engineering lifecycle support agreements.
Across India, Nepal & Sri Lanka
Commercial real-world operations
Zero catastrophic electrical halts
Full SLA hardware & OTA support

Founder & CEO at SolveMpire. Directing multidisciplinary product engineering, mechanical architecture, embedded hardware systems, and scalable connected platforms.

Co-Founder & Chief Operating Officer at SolveMpire. Leading operations, supply chain execution, manufacturing partnerships, and deployment logistics.

Co-Founder & Product Lead at SolveMpire. Driving product conceptualization, ergonomic mechanical packaging, industrial validation, and user experience.
Product Strategist & Marketing Lead at SolveMpire. Driving product go-to-market strategies, positioning, engineering documentation, and client engagement.
AI/ML Engineer at SolveMpire. Developing intelligent edge-AI models, computer vision pipelines, telemetry analytics, and predictive maintenance algorithms.
Electronics Engineer & PCB/VLSI Design Specialist at SolveMpire. Architecting custom multilayer PCB layouts, real-time embedded hardware, power distribution, and VLSI circuit designs.
HR Management & Lead Management Lead at SolveMpire. Driving talent acquisition, organizational culture, client lead qualification, and strategic relationship management across engineering projects.
Corporate Identity Number (CIN): U62013AP2025PTC122808.
Headquarters: SFNO 244/3, D.No: 2-247/2, Near Medha School Employee, Panasapadu, Kakinada, Andhra Pradesh, India.