WEDESIGN,ENGINEER,ANDMANUFACTUREPHYSICAL MACHINES& CONNECTED HARDWARE.
FreshPod Kiosk
Automated Sanitation
Veyo Mobility
Connected EV Telemetry
USS2 Switcher
Microcontroller Relay
Loah
ADHD Cognitive Support Software
Aditya University
Founding Campus & Incubation
Egg Vending Machine
Custom Mechatronics
FreshPod Kiosk
Automated Sanitation
Veyo Mobility
Connected EV Telemetry
USS2 Switcher
Microcontroller Relay
Loah
ADHD Cognitive Support Software
Aditya University
Founding Campus & Incubation
Egg Vending Machine
Custom Mechatronics
FreshPod Kiosk
Automated Sanitation
Veyo Mobility
Connected EV Telemetry
USS2 Switcher
Microcontroller Relay
Loah
ADHD Cognitive Support Software
Aditya University
Founding Campus & Incubation
Egg Vending Machine
Custom Mechatronics
SolidWorks GD&T
Mechanical Engineering
Altium Designer
Custom Multi-Layer PCB
FreeRTOS Kernel
Embedded Deterministic Firmware
ESP32-S3 & STM32
Industrial Silicon Architecture
AWS IoT Core
MQTT Fleet Telemetry
Razorpay / UPI
Dynamic QR & Payment Gateway
IPC-A-610 Class 2
Quality & Reliability Standard
SolidWorks GD&T
Mechanical Engineering
Altium Designer
Custom Multi-Layer PCB
FreeRTOS Kernel
Embedded Deterministic Firmware
ESP32-S3 & STM32
Industrial Silicon Architecture
AWS IoT Core
MQTT Fleet Telemetry
Razorpay / UPI
Dynamic QR & Payment Gateway
IPC-A-610 Class 2
Quality & Reliability Standard
SolidWorks GD&T
Mechanical Engineering
Altium Designer
Custom Multi-Layer PCB
FreeRTOS Kernel
Embedded Deterministic Firmware
ESP32-S3 & STM32
Industrial Silicon Architecture
AWS IoT Core
MQTT Fleet Telemetry
Razorpay / UPI
Dynamic QR & Payment Gateway
IPC-A-610 Class 2
Quality & Reliability Standard
SolveMpire is a specialist product engineering studio that designs, prototypes, and manufactures custom physical machines, electronics, and connected software.
Our multidisciplinary engineers take complex real-world problems from SolidWorks CAD and Custom Multi-Layer PCB to Deterministic RTOS and Turnkey Production.
End-to-End Systems
Delivered CAD to FieldSpecialized Engineers
Mechanical, PCB, RTOS & CloudUnified Disciplines
Single Point of OwnershipDirect Engineering
Zero Middle-ManagementHardwareshouldn't be yourengineering bottleneck.
Physical product development fails when mechanical CAD, circuit board fabrication, and embedded firmware are fractured across disconnected vendors.
SolveMpire provides a unified engineering bench. We engineer custom sheet metal chassis, spin multi-layer PCBs, flash deterministic FreeRTOS firmware, and deploy connected IoT dashboards under one synchronized roof.
We sit between your real-world problem and every physical system required to solve it.
Taking an automated machine or connected hardware product to market requires synchronized mechanical kinematics, robust power electronics, low-level firmware, and cloud telemetry.
We build that entire layer, validate it in our prototyping lab, and support it in the field so your core team stays focused on business growth.
MPIRE
How We Engineer.
A Connected 6-Stage Pipeline.
Discover
Understand goals, requirements & user needs
ERD specification, packaging constraints, and feasibility assessment.
Design
Conceptualize, engineer & validate the solution
3D CAD in Fusion 360, KiCad multi-layer schematics, and DFM analysis.
Develop
Build mechanical, electronic, software & integrations
Embedded RTOS firmware, DWIN DGUS HMI, and cloud telemetry.
Prototype
Prototype, test & iterate for performance and reliability
Functional 3D printing, PCBA assembly, IP65 sealing, and vibration tests.
Manufacture
Support production, quality & supply chain
Tooling fabrication, CNC sheet metal bending, and factory QA test jigs.
Deploy & Support
Deploy in the field and support for long-term success
OTA remote firmware updates, fleet monitoring, and 10-year support SLAs.
Real-World Systems.
Built, Tested & Shipped.

Freshpod Helmet Sanitization Machine
Modernized and redesigned FreshPod's automated helmet sanitization machine from the ground up — reverse-engineering the complete physical assembly in Autodesk Fusion 360 (80+ parts), recreating the master control PCB to eliminate legacy freeze states, rewriting firmware for dynamic Razorpay UPI QR codes, redesigning DGUS HMI tools, and deploying OTA updates with real-time heartbeat telemetry across 200+ machines in 3 countries.

Portable Secure Communications Device — Mechanical Product Design
Successfully packaged a 16650 battery, RF modules, PCB, structural features, sealing elements, and passive thermal management within a 25 mm enclosure while maintaining production-ready manufacturability.

USS2 Switcher — Compact IP65 Automotive Sensor Housing
Engineered an 18 mm × 75 mm cylindrical automotive sensor enclosure integrating a 66 mm PCB, sensor assembly, wiring, threaded vehicle mounting, and O-ring sealing within an extremely constrained package.

FreshPod Connected Helmet Sanitization Platform
We engineered the complete connected software and firmware modernization for FreshPod India — upgrading legacy firmware to handle dynamic Razorpay UPI QR codes, building custom DGUS display tooling, deploying dual-partition OTA updates, and building centralized cloud fleet telemetry across 190+ deployed machines.
Hardware gaps in product roadmaps & client RFPs
A client asks whether you can deliver a dedicated physical device, automated kiosk, or connected controller. Deals stall while software teams scope mechanical and PCB work nobody was hired for. We take the entire hardware scope and build it.
Constrained in-house engineering & multi-vendor chaos
Constant firefighting and finger-pointing across disconnected CAD freelancers, overseas PCB fabs, and firmware contractors. Shift total ownership of the physical system to our integrated studio.
Transitioning prototypes into certified volume production
A 3D-printed proof-of-concept is not a commercial product. We engineer for mass manufacturing (DFM), sheet metal CNC tooling, automated testing fixtures, and volume SMT fabrication.
Launch faster, say yes to physical RFPs
Ship hardware prototypes and production machines on predictable timelines your commercial team can confidently commit to.
Specialized engineering you can't easily hire
Access a synchronized bench of mechanical kinematic designers, multi-layer PCB layout leads, and firmware architects under one direct contract.
A turnkey partner, not a broker
We stay engaged through pilot build, board bring-up, field testing, and volume manufacturing. We take total ownership of delivery.
We work with venture-backed hardware startups, IoT companies, and industrial labs. We own the complete hardware and firmware engineering layers so your team can scale with confidence.
Real deliveries.
Direct from the founders & leads.
“Hanish and the SolveMpire team did a great job with the compact sensor housing design. Fitting the board and seals into an 18 mm threaded cylindrical profile was tight, but the 3D printed prototypes fit cleanly on the first try and let us move straight into sample builds. Fast turnaround and great communication whenever we needed format or tolerance adjustments.”
“Working with SolveMpire made our hardware journey much smoother. They handled the stainless-steel enclosure design, custom control board, and the touchscreen payment interface end-to-end. Having a single engineering team manage the mechanical, electronics, and firmware meant fewer headaches for us, and our machines have been running reliably in the field.”
“SolveMpire helped us solve the hardest part of our smart vending machine: designing a modular 42-compartment layout and reliable custom PCBAs. Their multi-layer board design with daisy-chained CAN door controllers kept our internal wiring clean and eliminated mechanical dispensing jams. Really solid engineering execution.”
Engineering Answers.
Clear, Transparent & Direct.
SolveMpire is a turnkey product engineering company based in Andhra Pradesh, India. We handle the complete lifecycle of physical products: 3D mechanical CAD (Autodesk Fusion 360), custom multi-layer PCB design (KiCad), embedded C++/RTOS firmware (STM32, ESP32, Linux SoMs), touchscreen HMIs (DWIN DGUS), cloud IoT telemetry with remote OTA updates, and volume manufacturing support (DFM, CNC, sheet metal, injection molding).
Complete CAD, KiCad PCB files, and firmware source code transfer upon project completion.
Designed for CNC, injection molding, SMT lines, and automated test fixtures from day one.
4 to 10 year engineering support agreements covering OTA firmware, telemetry, and hardware revisions.
