Unified Engineering Disciplines.
Physical & Digital Co-Design.
We bridge the gap between physical mechanics, custom electronics, embedded firmware, and cloud software. One unified engineering bench from initial concept to commercial tooling and field support.
Mechanical Product Engineering
Industrial and product CAD, enclosure design, sealing and ingress protection, thermal and airflow engineering, vibration-resistant structures, sheet metal and injection-moulding DFM, and complete production documentation.
- Industrial enclosure design & internal structural frameworks
- Precision O-ring sealing & ingress protection engineering
- Passive thermal management & airflow optimization
- Vibration-resistant PCB mounting & structural ribbing
- Sheet metal (CNC bending) & injection moulding DFM
- Manufacturing packages: CAD, STEP, DXF, BOM, and assembly drawings
Electronics & Embedded Systems
Custom PCB design, real-time control architecture, actuator drive, safety and interlock circuitry, embedded firmware, OTA update pipelines, and machine-state management.
- Custom multilayer schematic & PCB layout in KiCad
- Real-time microcontroller firmware (STM32, ESP32)
- Linux System-on-Module (SoM) application integration
- Industrial bus communication (CAN bus, UART, RS-485)
- Motor, solenoid, and actuator driver circuitry
- Fail-safe safety interlocks & remote error alerting
Machine Software & HMI
Touchscreen HMI development on constrained embedded platforms, UART/DGUS protocol layers, customer-journey UX for physical machines, and dynamic payment display flows.
- Custom touchscreen UI/UX design for physical machinery
- DWIN DGUS embedded display development & layout engineering
- UART-to-microcontroller synchronization protocols
- Dynamic UPI/QR payment code rendering without browser engines
- Step-by-step operator workflows & machine-state feedback
- Integrated audio cues & visual status indicators
Cloud, IoT & Digital Platforms
Centralized fleet management dashboards, device heartbeat and telemetry, transaction and revenue tracking, OTA firmware versioning, and secure web applications.
- Real-time machine monitoring & online/offline heartbeat detection
- Dynamic payment-session backend with prefetching architecture
- Remote OTA firmware distribution & version management
- Telemetry, error logging, and diagnostic dashboards
- Multi-tenant dealership, operator, and buyer role management
- Scalable cloud backends built on Next.js, Node.js, and TypeScript
