Prasad Duggirala — AI/ML Engineer at SolveMpire
AI/ML Engineer

Prasad Duggirala

AI/ML Engineer at SolveMpire. Developing intelligent edge-AI models, computer vision pipelines, telemetry analytics, and predictive maintenance algorithms.

ANDHRA PRADESH, INDIA
Technical Focus & Core Domains
Edge AI & Computer VisionMachine Learning TelemetryEmbedded Anomaly DetectionSensor FusionPredictive Maintenance
Research Publications by PRASAD DUGGIRALA
Articles by Prasad

Published Journal Entries

6 articles available
Industrial IoTComplete Guide

How Remote Diagnostics Reduce Downtime in Industrial Machines

Unplanned machine downtime costs industrial operations upwards of ₹50,000 per hour, yet 70% of field service calls are dispatched blind. Discover how to architect a complete remote diagnostics engine: hierarchical bitmasked error registries, 10-second pre-fault blackbox flash buffers, baseline telemetry drift detection, safe remote actuator jog testing, smart MOSFET rail power-cycling, and automated spare parts dispatch that slash MTTR from days to minutes.

Sep 29, 2026•29 min read
Read Journal
Industrial IoTDeep Dive

Industrial IoT Architecture: Edge vs Cloud Computing for Machines

Should your automated machines process telemetry at the edge or stream everything to the cloud? Discover why pushing raw high-frequency sensor streams to AWS or Azure results in bankrupting cellular data bills and lethal latency jitter, why isolated edge silos blind fleet management, and how modern industrial products combine local microsecond determinism with cloud-scale fleet intelligence using a resilient hybrid architecture.

Sep 27, 2026•28 min read
Read Journal
Industrial IoTComplete Guide

How to Build a Connected Industrial Machine: Hardware, Firmware, Cloud and IoT Architecture

Connecting an industrial machine to the cloud is fundamentally different from building a consumer IoT gadget. A missed command, an unencrypted payload, or a network drop during an actuator stroke can cause catastrophic physical damage. Master the end-to-end 7-tier architecture across Machine Mechanics, Industrial Controller I/O, Cellular/Wi-Fi Edge Gateways, MQTT/TLS Cloud Ingestion, Time-Series Databases, Real-Time Telemetry Dashboards, Automated Incident Alerting, and Fail-Safe Remote Actuation.

Sep 25, 2026•31 min read
Read Journal
Product EngineeringDeep Dive

System Engineering for Physical Products: Managing Hardware, Software and Mechanical Dependencies

Why physical products fail at the boundaries between disciplines. Learn how senior systems engineers define Interface Control Documents (ICDs), manage multi-domain dependencies, decompose subsystems, perform cross-domain FMEA, orchestrate progressive hardware bring-up, and execute end-to-end validation under single-contract accountability.

Aug 24, 2026•22 min read
Read Journal