← Return to Studio
01 / RESEARCH & ENGINEERING PAPERS

Engineering in Public.
Documenting Science & Systems.

Hardware teardowns, embedded firmware architecture, DFM principles, and deep dives into connected physical products engineered at SolveMpire.

Showing 4 of 96 articles
Sort:
Product EngineeringComplete Guide Featured Spotlight

Hardware Engineering Change Control: Managing CAD, PCB and Firmware Revisions Together

Manage hardware engineering changes across mechanical CAD, PCB, BOM, firmware, HMI, tests, stock, manufacturing, service, and field configurations with traceable release decisions.

Hanish Jyosyabhatla•7 min read
Read White Paper
Mechanical EngineeringComplete Guide

First Article Inspection for Custom Mechanical Parts: What to Verify

Plan first article inspection for custom mechanical parts with revision identity, material and finish evidence, characteristic mapping, measurement methods, deviations, and acceptance.

Lohith Medisetti — SolveMpire Engineering Author
Teja Mandapalli — SolveMpire Engineering Co-Author

Lohith Medisetti & Teja

Co-Authored Paper

Nov 17, 2026•7 min read