Registration for Batch 1 is officially closed. Stay tuned for Batch 2 launching soon.


Stop Building Tutorial Projects.
Build a Real Product.
An 8-week startup-style internship by SolveMPire × Risenine. Cross-domain teams. Real products. Live deployment. Demo Day. Not another certificate.

Building What's Next.
Risenine is a product studio engineering tools that change how people work, connect, and think.
Studio Philosophy
"We don't ship features. We ship conviction."
Every product at Risenine starts with a question no one has answered well enough yet. Then we answer it. This cohort works within the Risenine ecosystem, adopting the same engineering standards that build live platforms today.
CARDMATE
AI-powered credit card comparison platform finding you the perfect match. Currently tracking 150+ premium cards and calculating real-time rewards for thousands of users.
Your GitHub looks like everyone else's.
To-do list apps
Every student has one. No recruiter cares.
Tutorial clones
Copy-paste code ≠ engineering skills.
Certificate PDFs
Recruiters skip them in 2 seconds.
Recruiters open your GitHub and close it in 4 seconds. They're looking for proof you can build something real. Not proof you can follow a YouTube tutorial.
This is not another internship.
We don't give you recorded videos and a certificate. We put you in a startup team and make you build a real product from scratch.
Every Other Internship
- Watch recorded lectures
- Build tutorial projects
- Work alone
- Get a certificate PDF
- Nothing on GitHub
- No deployment experience
SolveMPire
- Learn by building real products
- Cross-domain startup teams
- Mentors guide you weekly
- Deploy live to the internet
- Clean GitHub with PRs & reviews
- Present at Demo Day like a founder
8 Weeks. One Product. Real Career Value.
Not a syllabus. A build journey — from zero to deployed product.
Foundations + Mindset
Git, GitHub, and professional dev environments. Deep dive into 'Good vs Bad' products. You're here to build proof, not just learn tools.
Tech + Product Thinking
50% specialization deep-dive + 50% product thinking. MVP logic, user psychology, and leveraging AI tools for speed.
Team Formation & Guided Allocation
Form teams and pick a high-quality problem space from our curated list. Refine scope and validate the core problem.
Product Design & PRD
Build detailed PRD and system architecture. Define clear user flows and cut features to focus on the core MVP value.
MVP Development
Build the first working version. Frontend, backend, AI integration — all hands on deck.
Deployment & Integrations
Deploy to cloud. Integrate APIs. Optimize UI/UX and performance.
Testing & Security
Bug fixing, security basics, testing workflows, performance monitoring.
Demo Day
Present your product professionally. Complete documentation. Clean GitHub repo.
Pick Your Track. Join a Team.
One specialization. Cross-domain teams. That's how real startups build products.
UI/UX Design
- Design Thinking
- Wireframing
- Figma Prototyping
- User Flows
Web Development
- HTML / CSS / JS
- API Integration
- Frontend Frameworks
- Backend Basics
App Development
- Mobile Architecture
- UI Components
- App Workflows
- Cross-Platform
AI / ML
- ML Fundamentals
- Dataset Handling
- Model Building
- AI API Integration
VLSI Design
- Digital Logic Design
- RTL Coding (Verilog/VHDL)
- FPGA Prototyping
- Synthesis & Timing
Embedded & IoT
- Microcontroller Programming
- Sensor Integration
- IoT Protocols (MQTT)
- Edge Computing
$100M Ideas Hiding in College Ecosystems.
Your team won't build random apps. You'll attack real economic systems — where money already flows and problems are painfully real.
Campus Hiring Intelligence Platform
Recruiters hiring from tier-2/3 colleges have zero visibility into real skill signals. They rely on manual resume screening with no way to verify talent quality before interviews.
Build a data platform that aggregates verified developer signals (GitHub, hackathons, contests) specifically for campus recruiters — without becoming a generic job portal.
India has 10M+ engineering students. Recruiting them is still manual, trust-less, and broken.
Campus Startup Infrastructure
Student founders lack the legal and operational 'startup-in-a-box' to incorporate, split equity, and manage investor updates, causing 90% of campus startups to die early.
A streamlined platform for instant legal templates, equity calculators, and founder agreements — focus on speed-to-setup rather than complex ERP features.
Students are starting earlier than ever, but lack the professional rails to survive the first 6 months.
AI Placement Preparation Engine
Students waste 100+ hours preparing randomly. Current platforms give generic questions but fail to track specific skill gaps or simulate high-pressure interview environments.
An AI engine that generates personalized prep roadmaps based on real-time weakness tracking — keep it focused on technical role prep, not generic soft skills.
Students already spend ₹5k–₹30k on random prep. A data-driven approach is an immediate win.
Campus Micro-Internship Marketplace
Full-term internships are bureaucratic and high-risk for companies. Students want experience but can't commit 6 months during the semester.
A marketplace for 3–10 day 'work trials' (e.g., build a landing page, optimize a query). Focus on verifiable task completion and instant payment for students.
Bridges the gap between 'no experience' and 'getting hired' by reducing risk for both sides.
Student Skill Reputation System
Resumes are easily faked or exaggerated. Recruiters don't trust claims and spend thousands on testing platforms to verify basic coding skills.
A non-gameable skill graph built from real project contributions and verified peer reviews. Build a trust layer, not just another portfolio site.
Trust in student talent is the biggest bottleneck in entry-level hiring today.
College Event Infrastructure Platform
College events are chaotic — sponsorship tracking, volunteer coordination, ticketing, budgeting — everything happens in random spreadsheets.
A platform to run college events like startups: sponsorship CRM, ticketing, volunteer task management, and finance tracking — all in one place.
India has 100,000+ college events yearly. Massive money involved, zero tooling.
Student Freelance Agency Network
Students freelance randomly with low pay, no trust, and no contracts. They get exploited, clients get inconsistent quality.
A managed marketplace for verified student squads — UI design teams, AI automation teams, web dev teams. Platform manages quality, payments, and project tracking.
Companies want cheap, quality talent. Students want real paying work. Both sides are underserved.
Campus Research Collaboration Network
Students doing research struggle to find collaborators, datasets, and publishing opportunities. Research is siloed and lonely.
A network connecting students, professors, and researchers around specific problems. Think GitHub for academic collaboration — shared datasets, co-authored papers, research squads.
India wants more research output. Collaboration tools for academia are terrible.
College Infrastructure Feedback System
Broken labs, bad WiFi, hostel issues, safety problems — campus problems go unsolved for years. Students complain randomly and nothing happens.
A structured civic feedback system for campuses: issue reporting, voting, escalation workflows, and resolution tracking with data-driven campus management.
Colleges need data-driven infrastructure management. This is a B2B SaaS play.
Campus Creator Economy Platform
Colleges have thousands of filmmakers, designers, musicians, and content creators — but zero ways to monetize talent on campus.
A platform where campus creators collaborate, find gigs, sell creative work, and get brand sponsorships. The creator economy meets the untapped campus talent pool.
Creator economy is exploding. Campuses are an untapped talent pool that brands want access to.
Brutal truth:Your team won't build random apps. You'll build products attacking real economic systems — hiring, freelancing, education, events, research, creator economy. Because money flows there.
Real Evaluation. Not Participation Trophies.
Every project is scored on a 100-point rubric — the same way real companies evaluate engineering work.
Outstanding
Strong
Decent
Weak
What You Walk Away With
Not a Certificate.
Real Career Value.
Real Team Project
Not a tutorial clone. A product built by a cross-domain team solving a real problem.
GitHub Portfolio
Clean repos, meaningful commits, pull requests, code reviews — portfolio recruiters actually respect.
Deployed Product
Live application. Real URL. Working backend. Not 'it works on my laptop.'
Demo Day Experience
Present like a startup founder. 3-minute pitch. Live demo. Judges panel. Real pressure.
Mentors Who Build for a Living.
A combined squad from SolveMPire & Risenine — engineers, designers, and startup founders who have built platforms serving thousands. No part-time theorists.

Architect
Overseeing system design and engineering standards across all cohort projects.

Robotics Expert
Mentoring on hardware-software integration, sensors, and autonomous system design.

Lead Mentor
Driving technical excellence and production-ready code deployments.

Product Design
Crafting intuitive user journeys and high-impact visual identities.

VLSI Architect
Expert in chip design, FPGA prototyping, and building production-grade embedded systems for IoT.

Operations
Managing cohort logistics and startup-style project management.
The Earlier You Join, The Less You Pay.
We value early conviction. Our pricing increases automatically as seats fill up. No extensions. No exceptions.
1 - 50 Members
Massive 80% discount for the foundation batch.
51 - 150 Members
Standard pricing for the scaling phase.
151+ Members
Final pricing for remaining open slots.
Why this model? We want to build with builders who don't overthink. The founding 50 members get the most attention and the lowest price.
Clear Steps. No Surprises.
Payment is just the start. Here is how you go from enrollment to building in 5 simple steps.
Instant Confirmation
Immediate success message with your next steps. No waiting in the dark.
Generated Unique ID
Receive your unique student ID and registration form link in your inbox within 5-10 mins.
Mandatory Registration
Use your Unique ID to submit your final details and finalize your specialization track.
Seat Verification
Our team validates your submission and officially marks your seat as 'Confirmed'.
Final Onboarding
Join private community channels and get your 8-week engineering schedule.
Seat confirmation is strictly linked to your **Unique ID**. You must complete the registration form within 24 hours of payment to secure your spot.
Straight Answers. No Corporate BS.
No. You build a real product, deploy it live, and present it on Demo Day. The certificate is secondary — the portfolio is what matters.
Week 1–2 cover foundations. Mentors and TAs support you throughout. You'll be in a team — you don't have to know everything from day one.
No. You join one specialization (UI/UX, Web, App, AI/ML, VLSI, or Embedded & IoT). But your team will include members from other tracks — that's how real startups work.
Plan for 10–15 hours per week. This includes sessions, team meetings, and development work. It's structured like a real engineering sprint.
We don't guarantee jobs. We guarantee you'll leave with a deployed product, a strong GitHub portfolio, and Demo Day experience — the things that actually get you interviews.
Teams are cross-domain (4–6 members) with roles: Product Lead, UI/UX Designer, Developer(s), AI/ML Engineer, and Hardware/IoT Engineer. We balance skill levels strategically.
Build Something Real.
Stop Watching Tutorials.
Current Price
Next Price Hike
Effective after 50 members
🏁 All 50 seats for Batch 1 are officially confirmed!
SolveMPire × Risenine · 8-Week Startup Internship · Batch 1